Plan and examine
We coordinate drawings, site conditions, survey controls, project requirements and approvals before construction begins.
Our new-build process connects project planning, crew coordination and quality control from the first drawing review to occupancy and handover.
Our 34-stage quality control program sets completion expectations, records evidence and requires signed verification at critical stages.
We coordinate drawings, site conditions, survey controls, project requirements and approvals before construction begins.
Layout, bearing, footings, reinforcement and foundation work receive documented checks before concrete, loading or backfill.
We verify structural connections, roof construction, windows, doors and the building envelope, with photographs before key details are concealed.
Plumbing, electrical, heating, ventilation, fire separations, insulation and air barriers are checked and tested before walls and ceilings close.
Room inspections, moisture checks, finish standards and system testing support a complete, functioning building.
We close blocking deficiencies, coordinate required authority inspections and obtain occupancy authorization before handing over for occupation.
Crew leads record daily progress and site photographs. At least weekly, our QC meeting reviews quality, open issues, trade interfaces and upcoming inspections.
Each project has assigned responsibilities, milestones and inspection hold points. Changes, questions and corrective work are recorded with an owner and due date so the next activity is coordinated with actual site readiness.
Our internal team portal keeps progress reports, photographs, checks and meeting records together by project. It supports site supervision and the review of completed work.
Work that does not meet approved project requirements is recorded, contained and assigned for correction. Repairs receive reinspection and documented closure. Crews cannot pass critical pour, backfill or concealment hold points until the required checks are released.
Internal quality sign-offs support required professional and authority inspections. Occupancy is authorized by the applicable authority; our internal approval does not replace it.